Hotel
Stanley Apartment is a residential building in Kinshasa built over a basement with 6 floors above, offering secure parking alongside modern apartment living.
Basement construction in the local soil conditions required careful excavation and shoring planning ahead of the main structural pour.
Site assessment, BOQ, structural drawings and a transparent cost plan.
Manpower, materials and equipment on site; excavation and RCC foundations.
Phased slab cycles, high-grade concrete, strict QA/QC at every level.
Finishing coordination, snag-free inspection and on-time delivery.
Talk to us about your next project — from foundation to finish, in India or abroad.